Directional & surveying
Trajectory, anti-collision and survey quality as planning items.

Wellbore Technologies
Wellbore work covers trajectory, fluids, integrity, completions and the barrier envelope that must remain true after the rig has left.
A completion that cannot be described in the handover file is not complete. Cement, casing, wellhead and the Christmas tree are a system. We plan them as one.
Intervention and workover use the same barrier language as original construction. Different contractors do not get different physics.
Valves, chokes and gauges are not ornaments. They are the last mechanical sentences in a well-control story that started in the reservoir. If a gauge cannot be read, it is not a gauge.
Handover to production includes annulus monitoring, lock-open/lock-close status and the drawings that match the steel.
Permanent barriers are designed, placed and evidenced. A well that no longer flows is not a well that no longer exists. We treat P&A with the same hold-points as a development well.

In practice
We photograph gauges only when the reading is part of the evidence pack. The BOP, the wellhead and the Christmas tree each get their own tests. Mixing them in one paragraph is how evidence gets lost.
Capability notes
Trajectory, anti-collision and survey quality as planning items.
Hydrostatic column designed and watched. Kick indicators are events.
Zonal isolation proven, not assumed from pump charts alone.
Lower and upper completion, barriers and handover to production.
Annulus monitoring, corrosion and the file production actually uses.
Permanent barriers to the same standard as a producing well — not a leftover.
Operators ask
We support the well-engineering interface and the execution gates. The programme names who turns the bit.
Two independent barriers, proven, documented. Verbal assurance is not a barrier.
Yes, with a file production can operate. If the tree cannot be described, it is not handed over.

From the field
How energy companies actually work
Primary barrier is usually hydrostatic — the mud column. Secondary is mechanical — the BOP. If either is unproven, the bit does not turn.
Offshore is weather, marine spread and the stack. Onshore is access, water, pads and neighbours. Do not copy a jack-up plan onto a land pad.
A hold-point is a named gate with a criterion and an owner. ISO 45001 is the management-system language. A poster is not.
Solar on a producing location still needs isolations, lifting and SIMOPS. Reliability first. Intensity reduction second.
Investor administration uses the same idea as well control: nothing posts without evidence.
Roads, noise, local workforce and grievance routes belong in the mobilisation pack.

Safety as an operating condition
P&ES treats competence, barriers, SIMOPS and return-to-service as hold-points. Digital tracking names who released the step. Stop-work is not insubordination.
The energy system
Upstream
Exploration, appraisal and development are different jobs. The abandonment plan should be visible before the first joint.
Plant
Inspection planning is production support, not a compliance tax.
Power
Interconnection and offtake decide whether a plant is an asset or a stranded slide.
People
Tickets have dates. A frozen crew list is a hold-point. A CV is a biography.